Insights
Practical, authoritative guides on luxury construction in London, written by the people who deliver it.
Luxury Construction
What actually defines a luxury builder, craftsmanship, the specialist supply chain and the prime postcode logistics behind high end construction in Mayfair, Knightsbridge and Chelsea.
Read the Guide
Residential Construction
What residential building contractors do, what "bespoke" and "custom" really mean, and what distinguishes a true custom building specialist from a general builder.
Read the Guide
Cost Guide · 2026
A detailed breakdown of luxury refurbishment costs in prime London, by specification tier and project type. In £/sq ft. Updated for 2026.
Read the Guide
Heritage · Guide
What you need to know before undertaking works on a listed building in London, consents, contractors, and common pitfalls.
Read the Guide
Strategy · Analysis
An honest comparison of the financial and practical case for new build versus full refurbishment in prime London property.
Read the Guide
Dubai · Cost Guide · 2026
AED and GBP cost ranges for luxury villa and apartment fit outs across Dubai's prime residential markets, Palm Jumeirah, Emirates Hills, Downtown. For 2026.
Read the Guide
Mayfair · Area Guide
Costs, consents, access logistics and what to expect from a luxury apartment refurbishment in Mayfair, with real figures from Crown Building's W1 projects.
Read the Guide
Cost Guide · 2026
A complete guide to basement conversion in prime London, excavation costs per m², structural requirements, waterproofing systems and the planning process. Updated 2026.
Read the Guide
Contractor Guide
What separates a prime contractor from a general builder: the right questions to ask, red flags to avoid, and how to run a proper tender process for a luxury London project.
Read the Guide
St John's Wood · NW8
Costs, conservation area considerations, programme and what to expect from a private residence refurbishment in St John's Wood. From Crown Building's NW8 project experience.
Read the Guide
Hampstead · Heritage Guide
Listed buildings, conservation area restrictions, TPOs and period material requirements, what every Hampstead renovation client needs to understand before starting work in NW3.
Read the GuideHow To Use These Guides
Most construction content online is written to rank, not to be used. These guides are written by Crown Building's senior team from projects we have actually run, which is why they contain figures, statutory timescales and specification detail rather than generalities. Three themes run through all eleven.
Every cost guide works in £/m² rather than headline totals, because a total tells you nothing without an area attached to it. The basement conversion guide gives banded rates up to £8,000–£15,000/m² for an ultra premium build with a pool, and anchors them against a real Knightsbridge mews project: approximately 85m² of new basement floor area at a contract sum of approximately £493,000, or roughly £5,800/m².
The luxury refurbishment cost guide and the Dubai fit out guide apply the same discipline to above ground work and to international projects.
The consents almost always set the programme, not the construction. Article 4 Directions made by Camden, Kensington & Chelsea, Westminster and others have effectively closed off the permitted development route for basements in prime London, so a full planning application with an eight week statutory determination period, frequently longer in practice, is the realistic assumption.
Party wall process runs alongside it: neighbours have 14 days to consent or dissent, notice periods are two months under section 3 and one month under section 6, and on a prime London basement the process typically adds two to four months before anyone breaks ground. The listed building guide covers consent where the property itself is protected.
Where a specification decision has consequences years after completion, the guides say so plainly. Waterproofing is the clearest example: BS 8102:2022 defines three system types, and the guides explain why a Type A barrier alone is a poor bet in ground conditions where the water table moves seasonally, and why a combined approach is the standard specification on our own projects.
The same logic runs through new build versus refurbishment and how to choose a prime residential contractor: the decisions that are expensive to reverse are the ones worth spending time on before contract.
If you would rather start with your own project than with a guide, the Project Assessor gives a first pass on complexity, specialist requirements and realistic programme in about three minutes, with no cost and no commitment. Our published portfolio sets out ten completed projects with their contract values and programmes stated.